Friday, October 4, 2013

Tuesday, July 9, 2013

Doors and closets


Stopped by the house today to meet the closet guy and figure out shelf spacing.  The crew was also working on the doors.

Sunday, June 30, 2013

Saturday, May 11, 2013

Siding, Cedar Posts, and Trim Color Selection

Went out to the house on Saturday afternoon to choose a trim color to go with our "Igloo Blue" house.  We chose the second color from the left (Charcoal Blue).  Most of the siding (HardiePanel with vertical board-and-batten look) appeared to be done.  We didn't get a pic of the front of the house though.  Read more for additional pics.  Also, don't forget to click on the photos to enlarge and enter slideshow view.

Wednesday, May 8, 2013

House Wrap, Windows, and Siding begins


Quick post...read more for additional photos!

Sunday, May 5, 2013

Plywood Sheathing & Exterior Colors

Plywood sheathing is up, so now we have an idea of what the house will look like with the walls up.  Our builder asked us to pick a house color, because siding will be up very soon and they'll be painting shortly after.  Mark wants our house to be as "green" as possible, so we are going with a light colored house to reflect light and reduce heat gain.  Read more to continue...

Friday, April 26, 2013

More framing...

This stage has been moving pretty quickly.  We've stopped by the site several times this week and it's fun to see the changes.  Once the siding is up, we will need to have some paint samples ready to test.  Luckily, we've had some help choosing colors :)  Read more for additional pics!

Tuesday, April 23, 2013

Stairs, island, and windows

This is our second time to the house this week...The stairs have been built and we can now see where the kitchen island is going to be.  Also, the interior doorways and window headers are in place.  The house is starting to look smaller!  Standing in the future living/dining room, it was kind of hard to imagine how we're going to fit a couch and table/chairs...  And our downstairs half-bath is soo tiny.  But it's still exciting to see things happening!  I'm sure we'll figure it out when it's time.

Sunday, April 21, 2013

Puppy Site Inspection #2


Mark and the pups standing on our front porch!  Another site inspection after a trip to the farmer's market.  Read more for additional pics.

Friday, April 19, 2013

Framing begins


They started framing pretty soon after concrete placement.  Read more to see more photos!

Wednesday, April 17, 2013

Concrete Pour


Our builder sent these photos of the crew pouring concrete for our foundation.  

Friday, April 12, 2013

And We're Back!


Finally worked out the FFE issues with the City on April 5th.  The plans did not have to be resubmitted, but they are requesting an extra tent survey that shows we are not violating the McMansion rules.  There were a couple guys working on the site today.  I chatted with John, one of the builder's field supervisors.  The cables are in place and he thinks they should be pouring by the middle of next week.  Read more for additional photos.

Thursday, March 21, 2013

ZzzZzz......

Nothing has changed since our first post on 3.6.13.  For some reason the forms don't match the finished floor elevation on the plans.  Apparently the City inspector is not accepting any of the builder's explanations/solutions for the discrepancy.  Foundation guy and architect are meeting today to come up with another solution to take to the City.  At this rate, the foundation won't be poured until mid-April or later!

3.20.13 - Looking east at house footprint.

Saturday, March 16, 2013

Still waiting...

Got an update from the builder on March 12th.  The City has an issue with the finished floor elevation.  Not sure exactly what the problem is, but the surveyor and architect are working through it.  Once they're cleared, copper, groundwire, and cables can be placed and they "should pour next week."  Seems unlikely cause Mark passed by the site on the 15th and there was still no progress...

Sunday, March 10, 2013

Puppy site inspection


Stopping by the site after the Mueller Farmers' Market.  Read more for additional photos of formwork and utilities.

     Mark and the pups standing in front of our future front door.

Wednesday, March 6, 2013

Foundation forms are up!



According to Mike, pouring early next week would be "very optimistic."  Not ready for a pre-pour inspection yet, but should be ready for inspection by the end of next week.